Transit projects
Horizontal Direction Drilling: is one of the methods of drilling pipe and cables under the buildings, rivers and streets. Our company is considered the first Iraqi company working with this system (HDD) project port:
Project crossing the Shatt al-Basra, length of 500m and a depth of 9m under the bottom level of the Shatt al-Basra to connect the carrier of water pipeline to the sports center at a cost of 2,500,000,000 for the General Company for the design and construction of industrial / the beneficiary is the Ministry of Youth and Sports.
D pipeline project ductile and 1 meter in diameter to the Sports City project in Basra and a length of 20 km